top of page
INSIGHTS, UPDATES & PROJECT HIGHLIGHTS


OUR LADY OF LEBANON GRAND BALL | Goldfish & Bay was proud to attend and support the 2026 Our Lady of Lebanon Grand Ball held at CommBank Stadium, Parramatta.
Bringing together parish members, sponsors, families and the wider community, the sold out evening celebrated a significant milestone for the Our Lady of Lebanon Co-Cathedral and its Master Plan 2028 vision. Following the recent Development Approval of the masterplan, the evening highlighted the next stage of investment into the Cathedral precinct, including improved accessibility, new community infrastructure, landscaped gathering spaces and memorial areas designed to serve
Rebeka Zubac
May 20


EDMONDSON PARK PUBLIC SCHOOL is among the first in NSW to achieve a 6 Star Green Star rating, setting a clear benchmark for sustainable education infrastructure.
The project delivers a contemporary learning environment with flexible teaching spaces, shared facilities, and outdoor areas. Goldfish & Bay was engaged during the construction phase to deliver hydraulic design and site support, ensuring the design intent was carried through into a compliant outcome on site. Our scope included detailed construction documentation (LOD300), RFIs, inspections and certification, supported by ongoing design development as site conditions evolved.
Rebeka Zubac
Mar 22


THIS MONTH IN ENGINEERING | When "Green" meets Gravity, Water and Time
For over a decade, architects and engineers have been wrapping buildings in plants. Green façades and living walls have become symbols of sustainable design. They cool the air, soften concrete skylines and promise harmony between the built and natural world. But many of these buildings are now showing what happens when design ambition meets time, weather and water. As buildings age, green façades are revealing a simple truth: sustainability without engineering endurance doesn
Rebeka Zubac
Nov 2, 2025
bottom of page
