top of page
INSIGHTS, UPDATES & PROJECT HIGHLIGHTS


TALLAWONG VILLAGE | Precinct Approaching Completion
As TALLAWONG VILLAGE approaches completion, the broader precinct is taking shape as a connected residential and community hub within Sydney’s north west growth corridor. Delivered by Deicorp, the development brings together 987 new homes, retail, and a publicly accessible park, all centred around the Tallawong Metro Station. Planned as a walkable, pedestrian-focused precinct, the project links residential buildings, retail, and public domain through a network of laneways and
Rebeka Zubac
11 hours ago


MARE | Byron Bay
Located within Byron Bay’s village centre, this boutique development brings together just eight residences within one of the most tightly held coastal locations in NSW. Designed by HGA Studio and delivered by Cobild , the project combines residential and ground floor retail within a low rise building shaped around a central courtyard, open-air circulation, and a landscaped laneway linking Marvell Street and Fletcher Lane. Rooftop gardens and a pool extend the shared amenity,
Rebeka Zubac
1 day ago


FALCON & ALEXANDER
FALCON & ALEXANDER is now under construction at the Five Ways intersection, transforming one of the lower north shore’s most prominent corner sites into a high-density mixed-use development. Delivered by Deicorp, with architecture by TURNER STUDIO and landscape by Land and Form Studios, the project delivers approximately 24,000 sqm of built form on a 3,200 sqm footprint. The scheme comprises over 200 apartments, supported by approximately 8,000 sqm of non-residential space, i
Rebeka Zubac
4 days ago


BOSCH REXROTH | Marsden Park NSW
A new industrial facility at Marsden Park is bringing Bosch Rexroth Australia’s manufacturing, engineering, and sales operations into a purpose-built environment designed around performance and operational efficiency. As a global leader in drive and control technologies, Bosch Rexroth supports industries ranging from manufacturing and automation to mining and heavy equipment, which directly informs how this facility needs to function. The development forms part of the broader
Rebeka Zubac
5 days ago


EASTER BREAK
As we head into the long weekend, it’s a good time to pause and recognise the work happening across our projects and teams. Thank you to our clients and partners for the continued trust and collaboration, and to our team for the effort behind the scenes. While the industry doesn’t fully stop, this break gives some of us a chance to step away. For many, work continues across sites and essential services. It’s a reminder that a lot of people we work with every day are still out
Rebeka Zubac
Apr 1


iCIRT RATING UPGRADE | 4.5 STARS
We have achieved an improved iCIRT rating of 4.5 stars. This reflects how our governance, technical oversight and project delivery systems have continued to strengthen since our initial 4-star rating. The iCIRT assessment is detailed and demanding. It requires organisations to demonstrate financial stability, operational systems and clear professional accountability in a transparent way. This is what gives the rating its credibility. For an engineering consultancy, this matte
Rebeka Zubac
Mar 31


LUNCH & LEARN with VINIDEX
Electrofusion jointing plays a critical role in the performance of PE pressure systems, particularly where consistency and long-term reliability are required. Our team recently had a session with Sam Sloan from Vinidex, who walked through this in more detail. Rather than staying at a product level, the discussion centred on how jointing methods directly affect performance, compliance, and installation quality on site. Polyethylene, particularly PE100, is commonly used across
Rebeka Zubac
Mar 29


ARCADE NIGHT | A few weeks ago, we headed out for what we thought would be a couple of games and an easy night
That idea didn’t last long. Arcade machines were claimed quickly, scores started getting tracked, and suddenly everyone cared a lot more than expected. Things carried on into bowling, where it somehow got louder, more competitive, and a lot more entertaining. There were a few surprisingly good shots, a few very questionable techniques, and plenty of laughing in between. Then came laser tag, and the energy shifted instantly. No teams, no plan, just everyone running around like
Rebeka Zubac
Mar 27


WATERLOO | One of the last remaining large-scale renewal sites in Sydney’s inner-south is now progressing
At Young and Bourke Streets in Waterloo, Coronation Property is advancing a BTR precinct of more than 850 apartments across a 2.15-hectare site, approximately four kilometres from the CBD. Historically characterised by light industrial uses and fragmented warehouse lots, the precinct has gradually shifted over the past two decades toward residential and design-led development. Sites of this scale are now increasingly rare in inner-city Sydney. The proposal is structured as a
Rebeka Zubac
Mar 24
bottom of page
