top of page
NEWS


WALTON STREET CAR PARK, PICTON | A rooftop deck on a flood prone site
Stormwater for a new rooftop deck on a Picton site that can sit under 2.35 m of water in a 1% AEP flood. Hydraulic and civil engineering by Goldfish & Bay.
Rebeka Zubac
1 day ago


ENGINEERING INSIGHTS | How a small escalator fire became a flashover in minutes
The 1987 King's Cross fire revealed the trench effect. What happened, what the inquiry found, and what it still teaches about fire safety design.
Rebeka Zubac
2 days ago


LANG WALKER AO MEDICAL RESEARCH BUILDING, CAMPBELLTOWN | A new home for medical research in south west Sydney
Goldfish & Bay delivered hydraulic services and fire hydrant design for the $55 million Lang Walker AO Medical Research Building at Campbelltown Hospital.
Rebeka Zubac
6 days ago


WHAT'S CHANGING | R410A is out for small VRF and multi head splits
Since July 2025, Australia has banned new imports of small VRF and multi head split units above 750 GWP. What it means for projects, with Samuel Youssef.
Rebeka Zubac
7 days ago


THE CAMBRIDGE, EPPING | Australia's tallest retirement village
A retirement village that goes up, not out Levande describes The Cambridge in Epping as Australia's tallest retirement village. The 29 storey tower holds 158 independent living apartments above a 132 bed aged care facility run by Opal HealthCare, a short walk from Epping's town centre and station. Residents have a clubhouse and bar, rooftop terraces and dining areas, a cinema, pool, gym, library and craft studios. It opened in late 2025. Built around a church and a school The
Rebeka Zubac
Nov 3


ENGINEERING INSIGHTS | Why doesn't the Empire State Building mind being struck by lightning?
Because the current has somewhere to go. What happened The US National Weather Service puts it at about 23 strikes a year. In one storm, according to NYC Emergency Management, it was hit eight times in 24 minutes. So much for lightning never striking twice. The engineering Tall buildings get hit because of their height, shape and isolation. Not because they're full of metal. Metal doesn't attract lightning. It only gives the current a path, and a good path is exactly what you
Rebeka Zubac
Nov 2


SABRINA BAILLIE | What happens after the engineer finishes the drawing?
Every engineering firm has a role most people never think about. At Goldfish & Bay, it's Sabrina's. Her role A drawing isn't finished when the engineer stops working on it. It's finished when it has been checked, recorded and issued. As our Document Control Manager, Sabrina leads the team that does that, and every drawing we issue passes through them. A drawing isn't finished when the engineer stops working on it. The checks Between issues, a set of drawings can pass through
Rebeka Zubac
Oct 30


WHAT'S CHANGING | City of Sydney's all electric rules start in 2027
If you're designing new homes, offices or larger hotels in the City of Sydney, gas is coming off the table. What's changing Council has approved changes to the Sydney Development Control Plan requiring certain new buildings to be all electric, including water heating. The controls take effect from 1 January 2027 and cover: all new residential buildings, offices over 1,000 m², hotels with more than 100 rooms, and serviced apartment buildings with more than 100 apartments. Who
Rebeka Zubac
Oct 28


GREGORY HILLS PUBLIC SCHOOL | A new school for a fast growing community
Delivered by School Infrastructure NSW for the NSW Department of Education, Gregory Hills Public School opened its permanent campus in July 2024, around 14 months after construction began, giving one of the state's fastest growing communities a school built for more than 1,000 students from Kindergarten to Year 6. The design Designed by Bennett and Trimble and built by Lipman Pty Ltd, the campus includes 44 classrooms and four support classrooms, a library, communal hall, can
Rebeka Zubac
Oct 27
bottom of page
