top of page
INSIGHTS, UPDATES & PROJECT HIGHLIGHTS


As projects begin to be recognised across the industry, it’s worth reflecting on what sits behind the finished outcome.
Across every project, engineering plays a central role in turning intent into something that can be built, coordinated, and delivered. It sits between design and construction, carrying decisions through to real conditions on site. You won’t see most of our work. But everything depends on it. Goldfish & Bay. Engineering the systems behind great buildings. #Engineering #BuildingServices #Construction #HydraulicEngineering #MechanicalEngineering #ElectricalEngineering #FireEngin
Rebeka Zubac
Apr 22


INSIDE THE LEADERSHIP TEAM | Goldfish & Bay
Getting this group in one frame required the same precision as fitting services into a basement ceiling with no millimetres to spare. So after a few “do we really need this?” conversations… here we are. The people in this image carry responsibility for how this business operates and delivers. They have built this company through discipline, technical depth and long-term trust with clients and collaborators. We are proud of the people in this frame. Just as importantly, we are
Rebeka Zubac
Feb 12


DE VILLE, MANLY
A seven-level mixed-use residential development comprising 12 oversized apartments above four ground-floor retail tenancies, delivered on a tightly constrained 598 sqm site with two basement parking levels. The upper three levels deliver full-floor penthouses with dual harbour and ocean views, incorporating a retained heritage element within the final scheme. Located at 9–11 Victoria Parade, De Ville is progressing through early construction following completion of demolition
Rebeka Zubac
Feb 10


BELGRAVIA | Potts Point is a new residential development proposed for 117 Victoria Street.
The scheme comprises a collection of 2, 3 and 4-bedroom residences, including a penthouse, on a tightly constrained inner-city site. Developed by Ceerose and designed by BVN Architecture in collaboration with Koichi Takada Architects, the project sits within a part of Sydney where tight site conditions, limited access, and planning constraints place pressure on how buildings are planned, serviced, and constructed. Rather than scale driving the design, key decisions are shaped
Rebeka Zubac
Jan 22


LUNCH & LEARN with Fantech | Understanding Performance in Ventilation Design
At Goldfish & Bay, our Lunch & Learn sessions play a practical role in strengthening how our engineers approach complex building systems. Our recent session with Fantech focused on the fundamentals of fan performance and the real conditions that influence system behaviour once designs move from drawings to site. Led by Nyasha Chiraga and Avinash ED, the session moved well beyond catalogue data. Their experience in system analysis and fan behaviour helped our team understand h
Rebeka Zubac
Dec 11, 2025


HILLS SHOWGROUND PRECINCT EAST | Lot 4
HILLS SHOWGROUND PRECINCT EAST is progressing as one of Sydney’s significant new residential precincts, and our team is now delivering the building-services engineering for Lot 4. This stage forms part of a broader development that will introduce 873 new apartments to Castle Hill across a coordinated group of towers. The Lot 4 appointment builds on our earlier work within the precinct and extends the continuity of our engineering involvement as the project unfolds. Our work i
Rebeka Zubac
Dec 4, 2025
bottom of page
