MONA, DARLING POINT | Precision on a tight site

Updated: 4 days ago
Some buildings make a statement. MONA, at Darling Point, also shows what it takes to build one.
The challenge
Lords Group's recent reflection on the project captures the challenge well. Its bold architectural form, intricate brick façade, curved detailing and layered geometry demanded real construction precision, with every curve, junction and material transition planned and coordinated on one of Sydney's most constrained building sites.
Its bold architectural form, intricate brick façade, curved detailing and layered geometry demanded real construction precision.
Our role
Goldfish & Bay delivered the hydraulic services design for MONA, covering plumbing, hot and cold water, gas and fire hose reels.
Congratulations to Lords Group and the project team, including Fortis (client), Neoscape (project management), Adams Consulting Engineers (structural engineering), MHNDU (architecture) and Richards Stanisich (interior architecture).















