top of page
INSIGHTS, UPDATES & PROJECT HIGHLIGHTS


FACTORY VISIT | Electrical team recently visited Vass Electrical Industries in Ingleburn for a factory tour and technical presentation focused on Electrobar busduct distribution systems.
The visit gave the team a detailed look into the manufacturing, testing, assembly, and deployment of high current busway infrastructure used across commercial, industrial, infrastructure, data centre, and high rise developments. Discussions covered fault ratings, voltage drop performance, modular riser configurations, take off systems, future expansion capability, and the growing role busduct solutions are playing across large scale electrical distribution networks. A major f
Rebeka Zubac
May 12


ON SITE | Last week, our team had the opportunity to visit TRILOGY in Macquarie Park with Plumb Group, walking the project from the basement through to the highest accessible levels of the tower.
At this scale, TRILOGY comprises three residential towers, with the tallest rising to approximately 59 storeys, making it one of the most significant high-rise developments in the Macquarie Park precinct. Hydraulic engineering therefore goes well beyond drawings and models, demanding careful planning around pressure zoning, vertical distribution, system coordination, and long term operational performance. This visit focused on learning and technical understanding rather than
Rebeka Zubac
Dec 9, 2025
bottom of page
