top of page

GREGORY HILLS PUBLIC SCHOOL | A new school for a fast growing community

Writer: Rebeka Zubac
Rebeka Zubac
Oct 27
1 min read

Updated: 4 days ago

Delivered by School Infrastructure NSW for the NSW Department of Education, Gregory Hills Public School opened its permanent campus in July 2024, around 14 months after construction began, giving one of the state's fastest growing communities a school built for more than 1,000 students from Kindergarten to Year 6.

The design

Designed by Bennett and Trimble and built by Lipman Pty Ltd, the campus includes 44 classrooms and four support classrooms, a library, communal hall, canteen, Outside School Hours Care, staff hub and covered outdoor learning areas, alongside sports courts and outdoor play spaces. The buildings are also a showcase for mass timber, with glulam and cross laminated timber structure throughout.

The challenge

A school of this size places very particular demands on its hydraulic systems. Hundreds of students use amenities, drinking fountains and play areas at the same moments each day, so water supply and drainage have to handle sharp peaks at recess and lunch, not just a steady average.

A school of this size places very particular demands on its hydraulic systems.

Our role

Goldfish & Bay is proud to have delivered the hydraulic engineering services for the project, and grateful to have played our part in a new school for the Gregory Hills community.

Images: School Infrastructure NSW and Lipman

FEATURED ARTICLE

LATEST ARTICLES

NEVER MISS A NEW POST

  • LinkedIn
  • Instagram
bottom of page